← All requirements
Demo request —
This request was created for demonstration only. No real buyer is behind it.
RFQ-00001000
Wanted: 160–240 t/h batch plant for Romania, 2018 or newer
Published 3 weeks ago · open until 16 Feb 2027
What the buyer needs
Motorway resurfacing programme starting in spring. We need a batch plant between 160 and 240 t/h, 2018 or newer, gas or dual fuel, with at least 25% RAP capability.
The site has a gas connection. Bitumen storage of at least 100 t total is required. We will dismantle and transport ourselves, so a plant that is currently erected and running is preferred — we would like to see it produce before committing.
The site has a gas connection. Bitumen storage of at least 100 t total is required. We will dismantle and transport ourselves, so a plant that is currently erected and running is preferred — we would like to see it produce before committing.
Technical requirements
| Manufacturing year | from 2018 |
|---|---|
| Production capacity | 160 – 240 t/h |
| RAP compatible | Yes |
| Maximum RAP percentage | from 25 % |