Skip to content
AsphaltHub
← All requirements
Demo request — This request was created for demonstration only. No real buyer is behind it.

RFQ-00001000

Wanted: 160–240 t/h batch plant for Romania, 2018 or newer

Published 3 weeks ago · open until 16 Feb 2027

What the buyer needs

Motorway resurfacing programme starting in spring. We need a batch plant between 160 and 240 t/h, 2018 or newer, gas or dual fuel, with at least 25% RAP capability.

The site has a gas connection. Bitumen storage of at least 100 t total is required. We will dismantle and transport ourselves, so a plant that is currently erected and running is preferred — we would like to see it produce before committing.

Technical requirements

Manufacturing year from 2018
Production capacity 160 – 240 t/h
RAP compatible Yes
Maximum RAP percentage from 25 %