What RAP percentage actually costs you

· 4 minute read

A plant rated for 40% RAP will not give you 40% on every mix, and the difference is where the money is.

The plate figure and the working figure

Recycled asphalt pavement is the largest single lever on material cost, and the percentage on the specification plate is an upper bound reached under favourable conditions: dry material, consistent gradation, a mix design that tolerates it.

What limits it in practice

Moisture is the usual constraint. Every point of moisture in the RAP is energy spent in the dryer, and on a cold-feed system that energy comes out of your production rate.

Questions worth asking a seller

  • What percentage was achieved on the last full production season?
  • Is the RAP fed cold into the mixer, through a recycling ring, or through a parallel drum? The three are not equivalent.
  • What happened to production rate at that percentage?